Menu
Cart 0
ErosTek Extra Long Leadwire ST2016

Extra Long Leadwire

ErosTek

  • $20.00


108" Long Extra-Long Leadwire for all ErosTek Power Units. This custom-molded leadwire connects to the output jack of any power unit having 3.5mm phone jacks, including all the ET312B, ET232, ET302R, most Folsom and PES power units.

Includes: (1) 108"L output leadwire

Specifications: (1) Male 3.5mm phone plug to (2) 4mm male banana plugs.

Also Available: 52"L Output Leadwire, factory supplied with all ErosTek Power Units.


We Also Recommend